This week was all about the Bridge Building Contest. We are given 3 Manilla Folders and 3 feet of tape to make a bridge that spans an 18 inch gap. Whichever bridge holds the most weight in magazines wins. Our design is 6 triangular beams that interlock together and use gravity to hold up. We were also given 10,000 Engineering bucks to bet for and against other bridges.